Saturday, March 28, 2015


ATTEMPTING TO IMPROVE AND ENSURE SUSTAINABILITY OF THE SEWERAGE 
NETWORK
WORKS MINISTRY REPLACES 2 PUMPS IN MALKIYA E2E PLANT


In an attempt to increase the efficiency of sewerage plants and minimize defects in the sewerage network, the Sanitary Engineering Planning & Projects Director at the Ministry of Works, Municipalities & Urban Planning Eng. Asma Murad carried a visit to the urgent works to supply and construct pumps for the lifting and pumping stations at various locations; which are now progressed by 27%. 

The project aims to maintain plants, increase their efficiency, ensure sustainability, minimize defects and therefore control sewerage floods that could occur in areas connected to these plants. Works include surveying 71 lifting and pumping stations, supply and replace some pumps and control panels, in addition to carrying out related electromechanical works. 

The BD1,297,650 project was awarded to Zohal Construction Company.

Murad inspected the E2E pumping station located in Malkiya, which witnessed the replacement of 2 pumps, and the E8E pumping station at the educational area in Isa Town; at which work is presently underway.





No comments:

Post a Comment